IQIP is supplying three 800t Combi Lifting Tools for the assembly of Vestas’ wind turbines at the Arcadis Ost 1 wind farm. This deployment comes after IQIP’s largest Combi Lifting Tool, which lifts up to WLL 3000t, was successfully used to conduct lifting operations for monopile installations at the wind farm.
The Combi Lifting Tool, which replaces of conventional shackle and rigging connections, is ideal for projects where maximum efficiency on lifting operations is a priority. The tool allows equipment to be placed with fewer crane movements and vertical transits, and has delivered a 20% reduction to installation time on previous projects. The more the tool is used for lifting, the more installation time is saved.