Our service engineers are trained in working with the C-66 and know how to get the most out of this innovative product and therefore, also the Hydrohammer. They will make sure that there is optimal energy delivery by controlling the blow count and blow energy of the hammer. This is based on extensive research done by our people to improve the piling process with knowledge and data from hundreds of successful projects. Next to that, with the C-66, we have also enhanced the underwater piling process.
THREE DIFFERENT SCREENS FOR PROJECT TRANSPARENCY
The pile inclination and measurement data will be shown on three different screens for improved project transparency—two screens for direct control and one to have a real-time view of the piling process. Three monitors are connected to the control unit. We call these the C-66 POU, C-66 SOU and the C-66 SMU. The primary operation unit, secondary operation unit and the monitoring operation unit. The most fundamental operational unit is the POU because the pile driving process is controlled from this screen. Operational unit SOU is always next to POU and shows the settings of the Powerpack. The third monitor can be placed anywhere on board. The pile driving process is displayed on this one.