Succesful installation of the monopiles at the offshore windproject Nyuzen Town
Off the coast at Nyuzen town of Toyama Prefecture, the construction of Japan’s first 100% private-sector offshore wind power generation is being constructed. To supported our client, IQIP mobilized a range of IQIP equipment, including an S-2000 hammer spread with a Flanged Upending Tool (750t FPUT) and Pile Guiding Tool (PGT). This equipment successfully installed the monopiles of over 51-meter length and 5.5 outside diameter.
Read more